BlockBuster MALL
A full range of building services for one of Ukraine’s largest shopping and entertainment centres.
- Total floor area
- 120,000 M²
- Building services systems
- 7
- Delivery
- 2021-2023
- Client
- Dragon Capital
- Total floor area
- Shopping centre
About the project
Blockbuster Mall is a modern regional shopping and entertainment centre with extensive, complex building services. Our team delivered the full scope of work, from design to commissioning and handover.
Systems delivered
- Ventilation and air conditioning
- Heating
- Water supply and drainage
- Power supply and lighting
- Automation and building management
- Fire detection and suppression
The challenges
- The work took place on an active construction site with a demanding schedule and limited space.
- Comfortable conditions had to be maintained for visitors despite high heat loads.
- Complex logistics for the delivery and installation of high-capacity equipment.
- Integration of all systems into a single building management platform.
Our solution
- We optimised installation processes and developed a phased schedule coordinated with the overall construction programme.
- We implemented energy-efficient equipment and automated indoor climate control systems.
- We organised effective on-site logistics and procurement to prevent downtime.
- We created a single system for monitoring and controlling all building services.
Project photo gallery
06
CONTACTS
LET’S DISCUSS THE ENGINEERING FOR YOUR NEXT PROJECT
We are ready to be your partner at any stage, from the first idea to ongoing maintenance. Send an enquiry and our specialists will get in touch.
Kyiv, 02081
48 A. Akhmatovoi Street